EN
Commissioning
2
Mounting
Installation via holes for M4-sized screws in the case or via a mounting system
(accessory).
A Bar code tape
B Middle of the scanning beam (device middle, output position value)
C Scanning beam
D Reading distance
E Beam exit
F Vertical angle of inclination 10°
X Dimension X (see table)
NOTE
Degree of protection IP 65 is achieved only if the connectors and caps are
screwed into place!
3
Electrical connection – Commissioning with factory settings
Before connecting the device, be sure that the supply voltage agrees with the
value printed on the name plate.
For devices with integrated heating, the supply voltage must be wired with a
minimum 0.5mm
ble to loop the supply voltage through to other loads!
Ensure the device is correctly earthed. Unimpaired operation is only guaranteed
when the functional earth is connected properly.
Connect 24VDC voltage supply and, if necessary, switching input and HOST
interface.
Switch on supply voltage; the MS 3x status LED must illuminate green.
18
2
(recommended 0.75mm
2
) core cross section. It is not possi-