EN
IMPORTANT
Please read these instructions carefully before you start to assemble this greenhouse.
Keep these instructions in a safe place for future reference.
» Customer Service
For assistance with assembly or for replacement parts – please log onto our website
or call our service line (number is on the title page).
Additional information can be found at our website: www.palramapplications.com
» Safety Advice
•
It is of utmost importance to assemble all of the parts according to the directions.
Do not skip any step.
•
We strongly recommend using work gloves during assembly.
•
Always wear shoes and safety goggles when working with extruded aluminium.
•
If using a step ladder or power tools ensure that you follow the manufacturer's
safety advice.
•
Do not touch overhead power cables with the aluminium profiles.
•
Do not attempt to assemble the greenhouse in windy or wet conditions.
•
Dispose of all plastic bags safely keep them out of reach of small children.
•
Keep children away from the assembly area.
•
Do not lean against or push the greenhouse during construction.
•
Do not position your greenhouse in an area exposed to excessive wind.
•
Do not attempt to assemble this greenhouse if you are tired, have taken drugs or
alcohol or if you are prone to dizzy spell.
•
Hot items such as recently used grills, blowtorches etc. must not be stored in the
greenhouse. Ensure there are no hidden pipes or cables in the ground before
inserting the pegs.
•
This product is designed to use as greenhouse only.
» Care & Maintenance
When your greenhouse needs to be cleaned, use a mild detergent solution and rinse
with cold clean water. DO NOT use acetone, abrasive cleaners or other special
detergents to clean the clear panels. It is recommended to check periodically that
roof panels caps (plastic part 329 & profile 981) are set in place.
» Tools & Equipment
•
Tape measure
•
Work gloves
•
Lubricant
•
Phillips head screwdriver
•
Step ladder
•
Drill bit
•
Leveler
•
Silicone Spray
•
Rubber mallet
•
Large hammer
•
Adjustable Spanner / Wrench
•
T001 - Special tool for Screws 411 and nuts 412
» Before Assembly
Selecting a site:
- The greenhouse must be positioned
and fixed on a flat level surface.
- Choose a sunny position away from
overhanging trees.
We strongly recommend this
greenhouse being secured directly to a
solid concrete foundation. When doing
that use the pre drilled holes in the
metal base.
This is a multi-part assembly best
achieved by two people. Allow at least a
half a day for the assembly process.
Take out all components parts of the
packages. Sort the parts and check
against the contents parts list.
Parts should be laid out close at hand.
Keep all small parts (screws etc.) in a
bowl so they do not get lost.
Please note multi-sided profiles are used
in this greenhouse. As a result some
holes in the profiles are not used during
assembly.
Please review entire instructions before
starting. Carry out the assembly steps in
exact order.
•
Screws 411 and nuts 412 are used throughout the assembly process.
•
Screws 411 are to be assembled from the outside and nuts 412 from the inside of the
greenhouse.
•
If not specified otherwise, do not fasten screws and nuts (411 & 412) more than 2-3 turns only.
Do not tighten them until completion of the panels' assembly. These 2 icons indicate if screws'
tightening is required or not.
•
However, in some steps, temporary tightening of a few screws may be needed to prevent a
profile from falling.
» Notes During Assembly
•
You may use Silicon lubricant spray in order to help you
slide the panels into the profiles.
•
Do not spray the Polycarbonate panels.
•
Use a rubber malet if necessary.
During assembly you will encounter the information
icon, please refer to the relevant assembly step for
additional comments and assistance.
Step 52: Decide on the window's location before assembly.
Window can be installed in one of the indicated options.
Step 85: In case the window is not closed properly,
please release the screws step 76a+b, adjust the profile
and tighten the screw.
Step 100: Make sure the cable is threaded in the hole
(#7329) and does not interfere with the opening the window.
Step 101: Anchor the greenhouse to the ground by using
part #7331 for hard surface or part #7336 for soft surface.
Step 103: Stretch the cable by using part #7332
Important Recommendations
•
Firmly connect the greenhouse to a level position
immediately after completion of the assembly.
•
Anchoring the greenhouse can also be done
by drilling the base profiles and fasten it to
the ground using ground screws (screws
are not supplied).
•
Tighten all screws once assembly is completed.