This faucet complies with ASME/ANSI A112.18.1
and CSA B 125 Standards.
Este grifo se encuentra conforme con losestandares
de ASME/ANSI A112.18.1 y de CSA B 125.
3/4" Shower Connection Rough Set
8005
Conjunto de Conexión de Ducha 3/4"
~1-55/64" (~47mm)
2 3/4" (70mm)
1 37/64" (40mm)
3/4-14NPT
25/64"
( 10mm)
R
COMPLETE SHOWER CONNECTION ROUGH
R1
SUPPLY ELBOW 3/4"NPT
R2
SHOWER CONNECTION
R3
MOUNTING PIN (2 PCS.)
R4
ORIFICIE MR05 2.4 GPM (9.0 l/min.)
R5
O-RING SEAL (4 PCS.)
R6
SHOWER CONNECTION PROTECTION
R7
PROTECTION CAP
R8
PROTECTION SLEEVE (2 PCS.)
R9
PROTECTION CAP (2 PCS.)
R10
SCREW WITH ANCHOR (10 PCS)
Carefully unpack and inspect all the components for da-
mage. To protect against damage, return all components
to the carton until ready to install.
NOTE:
Each of the products that go into the chosen thermostatic set
has its own Installation Instructions.
IOG 2290.00
WALL-MOUNT THERMOSTATIC SHOWERING SET
CONJUNTO DE DUCHA TERMOSTÁTICA DE MONTAJE EN PARED
1-3/16" (30mm)
3/16" (5mm)
3-5/32" (80mm)
2-7/8" (73mm)
3-5/32" (80mm)
ENGLISH
ENGLISH
Installation Instructions
R
R3
R1
R2
R3
R10
CONJUNTO COMPLETO DE CONEXIÓN DEL DUCHA
CODO 3/4"NPT DE SUMINISTRO
CONEXIÓN DEL DUCHA
PERNO DE MONTAJE (2 PIEZAS)
BRIDA MR05 2.4 GPM (9.0 l/min.)
JUNTA O-RING (4 PIEZAS)
CONECTOR DEL DUCHA DE PROTECCIÓN
TAPÓN DE PROTECCIÓN
CASQUILLO DE PROTECCIÓN (2 PIEZAS)
TAPÓN DE PROTECCIÓN (2 PIEZAS)
TORNILLO CON ESTACA (10 PIEZAS)
PRODUCT INSPECTION
Desembale con cuidado y cerciórese de que ningún com-
ponente esté dañado. Para protección contra daños, vuelva
a colocar todos los componentes en la caja de embalaje hasta
el momento de su instalación.
ATENCIÓN:
Cada producto incluido en un dado conjunto termostático está
dodato de su propio libro de Instrucciones de Instalación.
5
Instrucciones de instalación
R10
R8
R9
R4
R5
R6
R8
R9
•
INSPECCIÓN DEL PRODUCTO
Rev. 1 January 2008
R7
2
ESPAÑOL
ESPAÑOL