lamber A81 Instrucciones De Uso página 46

Ocultar thumbs Ver también para A81:
Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

1) Connect the end of drain pipe "S" (fig.3 -
pag.38) th the drainage shaft.
Drain pipe should have slump to allow the
matters drain; under floor drain pipes should
have a dia. of 80-100 mm.
2) Connect inlet pipe "E" (fig.3 - pag.38) to a
3/4" screwed Gas tap .
Make sure there are no throttlings along the
pipe.
The National and Regional Standards existing
on the subject must be rigorously respected.
Parameters' programming
modification
A
B
13. Make sure that the wall switch is on;
14. Press at the same time buttons ''E'' (''-''
and ''+'') and then give power to the
15. Always pressing buttons ''E'', wait for 3
16. Modify the parameter acting on buttons
17. Press button ''C'' (START) to see in
18. To validate the modified parameters'
The parameters are stored.
Description
Language
Italian
C
French
Spanish
English
D
German
Time-out
Lev. 1-2
E
Time-out
Lev. 3
Rinsing (yes-not)
F
Total CYCLES
RESET Electronic card :
Press at the same time the 3 buttons ''B'', ''C''
and ''-'' (''E'') and always pressing them give
power to the machine by pressing button ''A''
to the position On.
44
machine by pressing button ''A'' to
position On;
seconds till on the display ''FACTORY
PARAMETERS'' and then ''Language''
will appear;
''E'' (''-'' and ''+'') to reduce or increase
the parameter value;
sequence all the parameters ( look at the
complete list in the following table);
value, run by button ''C'' (START) till the
last inscription ''Press start'' will appear;
Default
(Reset)
Italian
2s
30s
Yes
___
Modified
parameters
DO NOT
MODIFY
DO NOT
MODIFY
Cycles' meter

Publicidad

Tabla de contenido
loading

Productos relacionados para lamber A81

Tabla de contenido