Main Function; Installation; Parts List - Lacor Inox MOLI Instrucciones De Uso Y Mantenimiento

Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 3
Grind coffee, seeds, nuts, grains, etc.
UNPACKING
1.- Open the box. Remove all packing materials and protective covering from the unit and parts.
2.- Remove all accessories and book instructions.
3.- Place the device on a hard surface, flat and level.
1 - Lid
2 - Blades
3 - Container
4 - Grinder Body
5 - Power Button
6 - Lid Lock
a) Lock position
b) Unlocked position
2
3
4
5
32

MAIN FUNCTION

INSTALLATION

PARTS LIST

1
6
a
b

Publicidad

Tabla de contenido
loading

Tabla de contenido