PolyVision a3 CeramicSteel Flow Manual Del Usuario página 5

Ocultar thumbs Ver también para a3 CeramicSteel Flow:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Frameless Flow
1830 Horizontal Wall Bracket Positioning
1.
Define the centerline of the Frameless Flow installation
2.
Define the centerline of panel A and panel C. This will be the centerline of the brackets.
If uneven panels: from center of wall left and right 1830 mm (72").
If even panel: from center of wall left and right 915 mm (36")
3.
Define the top of the wall to install from the ground level.
4.
Measure 220 mm (8-11/16") down from top of predefined top of wall.
This mark is the bottom of the top wall bracket
5.
Measure 870 mm (34-1/4") down from the first horizontal wall bracket to define the position
of the second bracket.
6.
Use the predrilled holes of the wall bracket as a template to mark all the holes.
Pre-drill 6,5 mm (1/4") hole in the drywall. Insert all anchors into the holes and screw them flush.
Fix all the brackets. Make sure the top brackets are perfectly aligned, leveled and fixed firmly.
Repeat for all the brackets.
Doc # 143200 | Rev A | Page 8 of 38
Frontview
Frameless Flow
2420 Horizontal Wall Bracket Positioning
1.
Define the centerline of the Frameless Flow installation
2.
Define the centerline of panel A and panel B/C. This will be the centerline of the brackets.
If uneven panels: from center of wall left and right 550 mm (21-5/8") + 1320 mm (51-15/16") +
1100 mm (43-5/16"). If even panel: from center of wall left and right 660 mm (26") + 1100 mm (42-5/16").
3.
Define the top of the wall to install from the ground level.
4.
Measure 220 mm (8-11/16") down from top of predefined top of wall.
This mark is the bottom of the top wall bracket
5.
Measure 870 mm (34-1/4") down from the first horizontal wall bracket to define the position
of the second bracket.
6.
Use the predrilled holes of the wall bracket as a template to mark all the holes.
Pre-drill 6,5 mm (1/4") hole in the drywall. Insert all anchors into the holes and screw them flush.
Fix all the brackets. Make sure the top brackets are perfectly aligned, leveled and fixed firmly.
Repeat for all the brackets.
Doc # 143200 | Rev A | Page 9 of 38
Frontview

Publicidad

Tabla de contenido
loading

Productos relacionados para PolyVision a3 CeramicSteel Flow

Tabla de contenido