SJE Rhombus In-Site EZ Serie Manual De Instalación Y Operación página 2

Con sensor c-level
Ocultar thumbs Ver también para In-Site EZ Serie:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Mounting the Control Panel
1
Install top fastener using appropriate anchor.
Installing the C-Level
®
®
The EZ Series
In-Site
CL control panel operates with a C-Level™ sensor and 1 or 2 recommended fl oat switches. The C-Level™
sensor operates the Pump Start, Stop and Alarm functions. The back-up fl oat switches are for redundant off and high level
alarm.
Ensure all supply power to the control panel is turned OFF before installing or servicing the C-Level™ sensor, fl oat switches or
pumps in the tank. Failure to do so could result in serious or fatal shock.
Off
NOTE
Do not splice the C-Level™ sensor cable.
Do not run C-Level™ sensor cable or fl oat switch cables in the same conduit as the pump cables.
English 2
Sensor & Recommended Float Switches
2
Install bottom fastener(s) using appropriate anchors.
Power from Breaker

Publicidad

Tabla de contenido
loading

Tabla de contenido