Descargar Imprimir esta página

Maxon M-14-30 Manual De Instrucciones página 11

Publicidad

Idiomas disponibles

Idiomas disponibles

Do not use a battery charger for connecting power to Liftgate power cables.
1. Connect power from a 12 volt truck battery
to the Liftgate power cables extending from
the back of main frame housing.
2. Refer to operating instructions, in C2
Operation Manual, to unfold platform
and activate the Liftgate.
NOTE: With the POWER ON and
LIFTGATE ACTIVATED lights
on, the Liftgate can be raised
or lowered. If the Liftgate is not
used for 90 seconds, the control
will automatically deactivate.
3. Use the control switch to lower (DN) the
platform to the ground (FIG. 11-1).
LIFT CORPORATION Sht. 11 of 38 DSG#
CHECKING ACCESS TO SPARE TIRE
CAUTION
M-14-30
Rev. C Date: 12/12/17
USING CONTROL SWITCH
TO LOWER LIFTGATE
FIG. 11-1

Publicidad

loading

Este manual también es adecuado para:

289496-01289496-01g