Handling + Storing of Panels
Handling
•
When a
CeramicSteel panels are shipped, they
3
are protected by craft paper or a self-adhesive
transparent polyethylene film. Keep panels in the
original package until installation.
•
Handle with care to prevent damage.
•
Never slide panels off the stack during handling.
Panels should always be lifted and moved in a
vertical position.
•
Never place an a
panel in a vertical position on
3
the floor. This is to prevent damage to the edges.
•
Prevent dirt from settling on and between panels
to avoid surface damage, scratches or defects.
•
Follow all safety instructions regarding personal
protection when processing the panels.
•
Protect panel surface against sawdust and
sparks (metal particles).
•
a
CeramicSteel will chip when cut or drilled with
3
power tools. Hand-cutting can cause chipping
up to approx. 2 mm from the edge. When
chipping is in excess of 2 mm, please check the
state of cutting tools and check that the panel is
adequately supported and clamped to prevent it
from vibrating.
•
All cut or drilled sections should be protected
against humidity with PVC tape and/or by
covering/sealing profiles or sealing washers.
•
For detailed processing instructions, please refer
to the a
processing instructions.
3
Doc # 81815 | Rev B | Page 4 of 32
Storing
• Keep panels dry and free of debris.
• Store panels inside temps 50-90 °F (10-32 °C).
• Any panels stored outside should be protected
from inclement weather conditions.
• Place panels on hard, flat surfaces that are not
subject to standing water.
• a
CeramicSteel panels should be stacked no
3
more than three high.
• Panels should never be stored vertically or in
such a way that the corners are vulnerable to
damage.
If you have a problem, question, or a request, call
your local fabricator, your regional sales manager
or PolyVision Customer Service. PolyVision's global
customer service team can be contacted on
polyvision.com.
Required Materials + Equipment
Required Equipment
·
Drill
·
Pencil
·
#2 Bit
·
Level
·
Glass suction cup
·
2 or 3-step ladder
lifters (2)
·
Tape measure
·
Pliers
Materials Provided
NOTE: Items are not drawn to size. Quantity of wall anchors and screws will vary per product
due to the various widths. Board size determines the quantity of anchors and screws.*
Markers
a
CeramicSteel Sans panel(s)
3
Wall anchors*
1-1/4" self drilling screws*
(4 mm x 35 mm)
Before starting the installation of a
CeramicSteel Sans
3
1.
Verify that the required equipment is available and material provided is accurate.
2.
Provide adequate protection for finished floor surfaces.
3.
All a
CeramicSteel Sans installations should be carried out by two or more individuals.
3
Doc # 81815 | Rev B | Page 5 of 32
Eraser
Magnetic Marker Tray
Brackets*
Retention straps
(2 pcs)
* Table 1
Anchors /
Product
Brackets
Screws
Horizontal
2
Sans 2420
Vertical
3
Horizontal
2
Sans 1830
Vertical
3
Sans 1185
3
20
24
16
24
12