PolyVision a3 CeramicSteel Sans Manual Del Usuario página 3

Pizarra montada a la pared, sin marco, para borrado en seco y aplicaciones no sísmicas
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Handling + Storing of Panels
Handling
When a
CeramicSteel panels are shipped, they
3
are protected by craft paper or a self-adhesive
transparent polyethylene film. Keep panels in the
original package until installation.
Handle with care to prevent damage.
Never slide panels off the stack during handling.
Panels should always be lifted and moved in a
vertical position.
Never place an a
panel in a vertical position on
3
the floor. This is to prevent damage to the edges.
Prevent dirt from settling on and between panels
to avoid surface damage, scratches or defects.
Follow all safety instructions regarding personal
protection when processing the panels.
Protect panel surface against sawdust and
sparks (metal particles).
a
CeramicSteel will chip when cut or drilled with
3
power tools. Hand-cutting can cause chipping
up to approx. 2 mm from the edge. When
chipping is in excess of 2 mm, please check the
state of cutting tools and check that the panel is
adequately supported and clamped to prevent it
from vibrating.
All cut or drilled sections should be protected
against humidity with PVC tape and/or by
covering/sealing profiles or sealing washers.
For detailed processing instructions, please refer
to the a
processing instructions.
3
Doc # 81815 | Rev B | Page 4 of 32
Storing
• Keep panels dry and free of debris.
• Store panels inside temps 50-90 °F (10-32 °C).
• Any panels stored outside should be protected
from inclement weather conditions.
• Place panels on hard, flat surfaces that are not
subject to standing water.
• a
CeramicSteel panels should be stacked no
3
more than three high.
• Panels should never be stored vertically or in
such a way that the corners are vulnerable to
damage.
If you have a problem, question, or a request, call
your local fabricator, your regional sales manager
or PolyVision Customer Service. PolyVision's global
customer service team can be contacted on
polyvision.com.
Required Materials + Equipment
Required Equipment
·
Drill
·
Pencil
·
#2 Bit
·
Level
·
Glass suction cup
·
2 or 3-step ladder
lifters (2)
·
Tape measure
·
Pliers
Materials Provided
NOTE: Items are not drawn to size. Quantity of wall anchors and screws will vary per product
due to the various widths. Board size determines the quantity of anchors and screws.*
Markers
a
CeramicSteel Sans panel(s)
3
Wall anchors*
1-1/4" self drilling screws*
(4 mm x 35 mm)
Before starting the installation of a
CeramicSteel Sans
3
1.
Verify that the required equipment is available and material provided is accurate.
2.
Provide adequate protection for finished floor surfaces.
3.
All a
CeramicSteel Sans installations should be carried out by two or more individuals.
3
Doc # 81815 | Rev B | Page 5 of 32
Eraser
Magnetic Marker Tray
Brackets*
Retention straps
(2 pcs)
* Table 1
Anchors /
Product
Brackets
Screws
Horizontal
2
Sans 2420
Vertical
3
Horizontal
2
Sans 1830
Vertical
3
Sans 1185
3
20
24
16
24
12

Publicidad

Tabla de contenido
loading

Productos relacionados para PolyVision a3 CeramicSteel Sans

Tabla de contenido