Broan Elite RM51000 Serie Instrucciones De Instalación Y Seguridad página 6

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

INSTALL MOUNTING
BRACKET
1. Construct wood wall framing that is flush
with interior surface of wall studs.
Make sure:
a) the framing is centered over
installation location.
b) the height of the framing will allow the
mounting bracket to be secured to
the framing within the dimensions
shown.
2. After wall surface is finished, secure mount-
ing bracket to framing using dimensions
shown.
NOTE:
- On 8' ceilings, the hood distance above
cook top is :
minimum 24", maximum 30" (for Ducted
Configuration).
minimum 24", maximum 28" (for Non-
Ducted Configuration).
- On 9' ceilings, the hood distance above
cook top is :
minimum 26", maximum 30" (the air vents
on the upper flue will be exposed after
installation).
INSTALL FLUE MOUNTING
BRACKET
DUCTED AND NON-DUCTED
1. Assemble the flue mounting bracket,
adjusting outside width as shown. Fig.4
2. Carefully center the mounting bracket
directly over the range hood location.
3. Secure the bracket assembly to the ceiling
using (2) 4.8x38mm mounting screws
and drywall anchors. Make sure the
bracket is pushed into the corner, tight
against the wall and centered over the
hood.
38-1/16"= bottom of hood 24" above cooktop
44-1/16"= bottom of hood 30" above cooktop
FLUE MOUNTING
BRACKET
- 6 -
FRAMING BEHIND DRYWALL
3.9 x 5.7mm
FLAT HEAD
BRACKET SCREWS
9 13/16"
(249.8mm)
FIG. 4

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Rm52000serie

Tabla de contenido