Swing-N-Slide Pb 8289 Instrucciones De Ensamblaje página 46

Tabla de contenido

Publicidad

Fig. 36
CEMENT
CEMENTO
9"
b ridge Platform
Plataforma del puente
Additional Anchoring:
Note: These instructions are for anchoring your unit in particularly sandy or otherwise loose soil.
1. Dig (2) holes for the Bridge Platform, (see pg. 29 for placement).
2. Dig (2) holes near the swing beam side of the tower as shown in (Fig. 36a).
3. Attach (2) 2'' x 4'' x16'' Anchor Boards, (not included in kit), on the base of the Tower as shown in (Fig. 36).
4. Pour gravel into each hole to a 6'' depth, as shown in (Fig. 36) and (Fig. 36a).
5. Pour cement into each hole until it is 1'' below the surface as shown in the figures above.
6. Cover the cement with dirt and compact.
Anclaje adicional:
Nota: Estas instrucciones son para el anclaje de su unidad en suelo particularmente arenoso o blando.
1. Excave (2) agujeros para la plataforma del puente, (vea la pág. 29 para la colocación).
2. Excave (2) agujeros cerca del lado de la viga del columpio de la torre, como se muestra en la (Fig. 36a).
3. Fije las (2) tablas del anclaje de 2'' x 4'' x 16'', (no se incluyen en el kit), en la base de la torre como se muestra en la (Fig. 36).
4. Vierta gravilla en cada agujero a 6'' de profundidad, como se muestra en la (Fig. 36) y (Fig. 36a).
5. Vierta cemento en cada agujero hasta que esté a 1'' por debajo de la superficie, como se muestra en las figuras anteriores.
6. Cubra el cemento con tierra y compáctela.
1"
24"
6"
GRAVEL
GRAVILLA
46
(2) 2-1/2'' Wood Screws Per Joint
Tornillos para madera de 2-1/2'', por junta
24"
6"
GRAVEL
9"
GRAVILLA
Tower
Torre
Fig. 36a
1"
9"

Publicidad

Tabla de contenido
loading

Tabla de contenido