M-16-32
LIFT CORPORATION Sht. 24 of 52 DSG#
Rev. B Date: 09/21/18
COMPLETE LIFTGATE INSTALLATION - Continued
6. To use the drop-away platform feature,
install drop pin and 3/8"-16 lock nut
(Kit items) on the bottom of RH column
(FIG. 24-1). Tighten lock nut securely.
DROP PIN
3/8"-16 LOCK NUT
(P/N 901016-4)
RH COLUMN
INSTALLING DROP PIN ON
RH COLUMN (C2 LIFTGATE SHOWN)
FIG. 24-1
7. Install the 3/8" round plastic plugs into
the empty holes in the bottom of the col-
umns.
8. If previously removed, reinstall spare tire.