Mounting
Frame Union
28. Complete the Tower Installation
Securely hand tighten the tower union nut to the mounting frame union. Be sure the union O-ring is
in place.
Carefully pivot the tower closed.
Align the holes at the top and bottom right corners of the tower with the slotted holes in the
mounting frame.
Thread a 3/8" bolt through the mounting frame into the top of the tower. Repeat at the bottom of
the tower.
Tighten the bolts securely, but do not overtighten.
NOTE: You will water test and inspect the tower and mounting frame later, so you may want to install
and hand tighten only one of the required bolts at this time. Both bolts will need to be securely tightened
later.
29. Faucets and Fittings
Because the system recirculates water, this installation requires the addition of a bath and shower
faucet to fill the basin and for personal cleansing. We recommend the K-1099 Taboret Rite-Temp
single control faucet or the K-1098 Taboret two-handle faucet. Talk to your distributor for additional
information.
Install the selected faucets and fittings according to the manufacturer's instructions.
1032108-2-A
Tower Union Nut
24
Bolt
Bolt
Kohler Co.