Page 6
New Construction Installation
6
Insert Mask and
Finish Ceiling
• Install ceiling material.
• Cut out around Housing.
CAUTION
IN ORDER TO PREVENT
MOTOR/CONTROL DAMAGE:
If the blower was unplugged, power must
be disconnected (see page 2, WARNING
item 2) before inserting motor plug into
control assembly.
7
Install Grille
Plug in
1
Sensor
8
Install Bulbs
3
2
1
See Page 12 for Operations, Cleaning
and Maintenance, and Troubleshooting.
Plug in
2
Light
3
ZB80ML n ZB110ML Installation Guide
Mask protects unit
during construction.
Remove before
installing Grille.
4
4
Night Light
(purchase
separately)