Pre-Installation
PLANNING INSTALLATION
There may be some issues during the installation of your new vanity. It is highly recommended that before you undergo this task, take a
moment to pre-plan the installation.
TOOLS REQUIRED
NOTE: Tools that may be required during installation.
Rubber mallet
Level
HARDWARE INCLUDED
NOTE: Hardware not shown to actual size.
AA
Part
Description
AA
Leg levelers (pre-installed on legs)
MATERIALS REQUIRED
Description
Wood screws
2" x 6" lumber (cut to fit between studs)
5/16" Lag Bolts (min 250lbs) load bearing
Washers for Lag Bolts
Safety goggles
Silicone Compound
Quantity
4
Quantity
2
1
2
2
3
Phillips
screwdriver