Tools and Materials
Pencil
Measuring
Tape
Safety
Drill
Glasses
Thank You For Choosing Kohler Company
We appreciate your commitment to Kohler quality. Please take a few
minutes to review this manual before you start installation. If you
encounter any installation or performance problems, please don't
hesitate to contact us. Our phone numbers and website are listed on
the back cover. Thanks again for choosing Kohler Company.
Before You Begin
Observe all local building codes.
The appearance of your vanity may differ from the illustrations in
this guide. The instructions still apply.
Unpack the new product and inspect it for damage.
Install the water supply and drain lines according to the
roughing-in information. The water supply nipples must extend
3" (7.6 cm) beyond the finished wall material.
Provide 2x6 backing material in the finished wall. The height
from the top of the 2x6 backing material to the floor must be
36-1/4" (92.1 cm).
Make sure the finished wall is straight and plumb, and the floor
is flat and perpendicular to the finished wall.
Remove any moldings that may inhibit the vanity from being
flush against the finished wall.
It is recommended that the drawer, door(s), and shelf be removed
from the vanity before beginning the vanity installation. Doing so
will ease the installation process. Refer to the sections contained
in this guide for proper removal.
1049900-2-B
Level
Miter Box
Screwdrivers
Hole Saw
2
Plus:
• Framing Nails
• Finishing Nails
• Wood Screws
• Wood Putty
• Decorative Cabinet
Hardware
2x6 Lumber
Kohler Co.