Leveler
Leveler
3. Install the Vanity
Remove the drawer, door(s), and shelf from the vanity. Refer to
the sections contained in this guide for proper removal.
Position the vanity against the finished wall.
Verify the vanity is level. If necessary, turn the levelers on the
bottom of the vanity to achieve level.
Mark the supply and drain locations on the inside of the vanity
back wall. Move the vanity away from the wall.
Cut the marked supply and drain locations from inside of the
vanity using a hole saw.
Position the vanity against the wall, aligning the supply and
drain locations with the cut holes on the vanity back wall.
Drill two pilot holes through the mounting rail and finished wall
on each side of the vanity. Make sure the two pilot holes are
spaced a minimum of 16" (40.6 cm) apart from one another.
Tighten a wood screw through each of the two drilled holes until
the vanity is flush and secure against the finished wall.
Additional wood screws may be used, if necessary.
If applicable to your model, cut the wood trim, then attach it
around the bottom perimeter of the vanity using finishing nails.
Apply wood putty to the top of each nail hole.
NOTE: If possible and applicable, install the faucet to the lavatory
before installing the lavatory to the vanity.
1049900-2-B
Finished Wall
Finished Wall
Stud
Stud
Vanity
Vanity
Wood
Wood
Screw
Screw
6
Mounting
Mounting
Rail
Rail
Kohler Co.