Descargar Imprimir esta página

Leuze electronic BCL 21 Manual Del Usuario página 20

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 24
EN
Commissioning
2
Mounting
Installation via holes for M3-sized screws in the case or via a mounting system
BT 20 or BT 21 (accessory).
D Mounting thread with thread depth of max. 4mm
E Optical axis (perpendicular beam exit - 90°)
F Optical axis (straight beam exit - 0°)
G Laser beam, opening angle adjustable
3
Electrical connection – Commissioning with factory settings
 Mount the BCL 2x and the corresponding connector unit.
 Connect the BCL 2x via the system plug.
 Connect the voltage supply and, if necessary, the interface and the inputs/out-
puts.
 As soon as the green PWR/Ready LED illuminates, activate the laser via input
SE1 or with online command '+' via the interface.
 Hold the example bar codes
ing.
 The laser beam switches off following successful decoding.
LED indicators
LED name
LED color
State
No voltage
Initialization (after reset)
System ready
Reading gate active
Hardware error (defective motor, laser,
system, etc.)
autoConfig/teach-in
Service interface active
20
at a suitable distance from the BCL 2x for read-
5
PWR/
Ready
green
off
flashing
(cycle1)
on
on
off
flashing
(cycle1)
on
ERR/
DEC/
Error
Decode
red
yellow
off
off
off
off
off
off
off
on
on
-
flashing
-
(cycle2)
flashing
-
(cycle2)

Publicidad

loading

Este manual también es adecuado para:

Bcl 22