•
Do not install unit at a site where fire detector is located at the supply air
side. (Fire detector may operate erroneously due to the heated air supplied
during heating operation.)
•
When special chemical product may scatter around such as site chemical
plants and hospitals, full investigation is required before installing unit. (The
plastic components may be damaged depending on the chemical product
applied.)
•
If the unit is run for long hours when the air above the ceiling is at high tem-
perature/high humidity (due point above 26 °C), due condensation may be
produced in the indoor unit. When operating the units in this condition, add
insulation material (10-20 mm) to the entire surface of the indoor unit to avoid
due condensation
3.1. Install the indoor unit on a ceiling strong
enough to sustain its weight
Warning:
The unit must be securely installed on a structure that can sustain its
weight. If the unit is mounted on an unstable structure, it may fall down
causing injuries.
4. Fixing hanging bolts
4.1. Fixing hanging bolts
[Fig. 4.1.1] (P.2)
A Center of gravity
(Give site of suspension strong structure.)
Hanging structure
•
Ceiling: The ceiling structure varies from building to one another. For detailed
information, consult your construction company.
Center of gravity and Product Weight
Model name
PEFY-P15VMS1(L)-E
PEFY-P20VMS1(L)-E
PEFY-P25VMS1(L)-E
PEFY-P32VMS1(L)-E
PEFY-P40VMS1(L)-E
PEFY-P50VMS1(L)-E
PEFY-P63VMS1(L)-E
5. Installing the unit
5.1. Hanging the unit body
u Bring the indoor unit to an installation site as it is packed.
u To hang the indoor unit, use a lifting machine to lift and pass through
the hanging bolts.
[Fig. 5.1.1] (P.2)
A Unit body
B Lifting machine
[Fig. 5.1.2] (P.2)
C Nuts (field supply)
D Washers (accessory)
E M10 hanging bolt (field supply)
6. Refrigerant pipe and drain pipe specifications
To avoid dew drops, provide sufficient antisweating and insulating work to the
refrigerant and drain pipes.
When using commercially available refrigerant pipes, be sure to wind commer-
cially available insulating material (with a heat-resisting temperature of more
than 100 °C and thickness given below) onto both liquid and gas pipes.
Insulate all indoor pipes with form polyethylene insulation with a minimum den-
sity of 0.03 and a thickness as specified in the table below.
8
W
L
625
752
625
752
625
752
625
752
625
952
625
952
625
1152
3.2. Securing installation and service
space
•
Select the optimum direction of supply airflow according to the configuration
of the room and the installation position.
•
As the piping and wiring are connected at the bottom and side surfaces, and
the maintenance is made at the same surfaces, allow a proper space prop-
erly. For the efficient suspension work and safety, provide a space as much
as possible.
[Fig. 3.2.1] (P.2)
A Access door
C Air inlet
E Ceiling surface
G Service space (viewed from the direction of arrow)
1 600 mm or more
3 10 mm or more
3.3. Combining indoor units with outdoor
units
For combining indoor units with outdoor units, refer to the outdoor unit installa-
tion manual.
•
If necessary, reinforce the hanging bolts with anti-quake supporting members
as countermeasures against earthquakes.
* Use M10 for hanging bolts and anti-quake supporting members (field supply).
X
Y
263
338
263
338
263
338
275
340
280
422
280
422
285
511
5.2. Confirming the unit's position and fix-
ing hanging bolts
u Use the gage supplied with the panel to confirm that the unit body
and hanging bolts are positioned in place. If they are not positioned in
place, it may result in dew drops due to wind leak. Be sure to check the
positional relationship.
u Use a level to check that the surface indicated by
that the hanging bolt nuts are tightened to fix the hanging bolts.
u To ensure that drain is discharged, be sure to hang the unit at level us-
ing a level.
[Fig. 5.2.1] (P.2)
A Indoor unit's bottom surface
Caution:
Install the unit in horizontal position. If the side with drain port is installed
higher, water leakage may be caused.
1 Select the thickness of insulating material by pipe size.
Pipe size
6.4 mm to 25.4 mm
28.6 mm to 38.1 mm
2 If the unit is used on the highest story of a building and under conditions of
high temperature and humidity, it is necessary to use pipe size and insulating
material's thickness more than those given in the table above.
3 If there are customer's specifications, simply follow them.
B Electrical parts box
D Air outlet
F Service space (viewed from the side)
2 100 mm or more
4 300 mm or more
Z
Product Weight (kg)
105
19
105
19
105
19
104
20
104
24
104
24
104
28
is at level. Ensure
A
Insulating material's thickness
More than 10 mm
More than 15 mm