INSTALLATION
INSPECTION
SHEET
Inspection after installation
• Inspect the installed / reinstalled parts for the following items.
Inspection Parts
Moonroof Wind Deflector
Gasket
Center Metal Clip
Outer Metal Clips
Important check items
• Inspect the installed / reinstalled parts for the following items.
Inspection Parts
Center Metal Clip Installation
Step 3 (pg. 2)
Outer Metal Clip Installation
Step 3 (pg. 2)
10-10-2018
Clearance / Fit
o
o
Part Name
Screw
Screw
Date:
Vin:
Approved
ENG INSP 1 of 1
MOONROOF WIND DEFLECTOR
Check Item (o)
Installation /
Scratches / Dirt
Engagement
o
Tightening
Check & Write
Torque
Tightening Torque
5.0 -7.0 lb/in
5.0 -7.0 lb/in
Checked
Person in Charge
Operation Check
o
o
o
Person in Charge
lb/in
lb/in
SG665 Rev-1