Setup
Stryker Endoscopy considers instructional training an integral part of the SDC
Ultra™ system. Your Stryker Endoscopy sales representative will perform at
least one in-service at your convenience to help you set up your equipment and
instruct you and your staff on its operation and maintenance. Please contact
your local Stryker Endoscopy representative to schedule an in-service after your
equipment has arrived.
1.
Choose a location for the SDC Ultra™.
Warning
RF and other mobile communications equipment may affect
the normal function of the SDC Ultra™. When placing the SDC
Ultra™, follow the instructions located in the "Electromagnetic
Compatibility" section of this manual.
2.
Connect peripheral devices according to the interconnection diagram
on the following pages.
Warning When the SDC Ultra™ is interconnected with other electrical
devices, leakage currents may be additive, resulting in
electromagnetic emissions that can interfere with the normal
function of electronic medical equipment. To properly control
electromagnetic emissions and avoid potential harm to the
patient or user, ensure all electrical devices are installed and
interconnected according to the requirements of IEC 60601-1-1.
8
• Place the SDC Ultra™ on a Stryker cart or other sturdy
platform.
• Provide at least four to six inches of space around the sides
and top of the SDC Ultra™ to ensure proper ventilation.