Ingeteam
The communications card switch (B in the following figure) must have position 3 On.
3.
Connect the rest of the charging stations according to the following figures:
First station
The jumper of the control card must be removed in all the stations except for the final station on the
communication ring, where it must be installed.
12
Intermediate station
ABA2017IQM01_B - Installation and Operation Manual
INGEREV GARAGE Wall
B
Final station