These chapters in the manual are to be used by qualified, authorized technical staff.
WARNING:
AFTER INSTALLATION, CHECK TO SEE IF THE MACHINE IS WORKING PROPERLY (see the
Installation Module C)
WATER CONNECTIONS
•
No leaks from the connections or tubes
FUNCTIONING
•
Boiler and operating pressures are normal.
•
The pressure gauge is working properly.
•
The self-leveling device is working properly.
•
The expansion valves are working properly
WARNING: ONCE THE MACHINE HAS BEEN INSTALLED AND IS READY FOR USE, BEFORE ALLOWING THE
WORKER TO START USING THE MACHINE, WASH THE INTERNAL COMPONENTS ACCORDING TO THE
INSTRUCTIONS BELOW:
GROUPS
•
Hook up the filter holders to the groups (without coffee).
•
Let each group dispense water for about a minute.
HOT WATER
•
Continuously dispense hot water (pressing the appropriate button) until at least 5 liters of water have been used for a machine
with 2 - 3 groups (see the "Cleaning and Maintenance" Chapter in the User's Manual).
STEAM
•
Dispense steam from the nozzles for about a minute, using the appropriate buttons.
6. Installation Check-up
36 EN
English
English