INSTALLATION INSTRUCTIONS
R
S
The switch is correctly installed
E
TART
230V
at this point.
It is now only possible to close
the hatch completely after having
raised the lever to position "I"
Fig. 4
(Fig. 4).
At the first start-up, trip the differential
R
S
E
TART
switch with the special system
checking instrumentation and the
device in automatic mode.
If the reset cycle is not concluded
correctly check the earth insulation of
the system.
The minimum insulation levels of the system, below which the device
signals an anomaly and goes into a wait state, are as follows:
- 12kΩ for versions with I
= 30/100mA
dn
- 2kΩ for versions with I
= 300/500mA
dn
22