Installation Of The Connection Pipe - Giatsu ROUND R32 GIA-C9I-18ROUR32 Manual De Usuario E Instalacion

Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

Installation of the Unit
3. Remove the installation model paper after ceiling installation.
4. Adjustment
Adjust the position of the main body, ensure
the ceiling edges evenly spaced and the
underside of the main body is recessed the
ceiling 5 to 25 mm.
(If products tilt the fixed pump to the
opposite direction, float switch failure may
occur, resulting in drop of water.)
5. Ensure the air conditioner is level and fit the air conditioner main body by fastening nuts to
the lifting screws.

Installation of the Connection Pipe

1. Flare Processing
(1). Cut the connection pipe with the pipe cutter and remove the burrs.
(2). Hold the pipe downward to prevent cuttings from entering the pipe.
(3). Remove the flare nuts at the stop valve of the outdoor unit and inside the accessory bag
of the indoor unit, then insert them to the connection pipe, after that, flare the connection
pipe with a flaring tool.
(4). Check if the flare part is spread evenly and there are no cracks (see Fig.11).
2. Bending Pipes
(1). The pipes are shaped by your hands. Be careful not to collapse them.
Extend the pipe by unwinding it
14
a spirit level
Fig.10
Fig.11
Fig.12

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Round r32 gia-c9i-24rour32Round r32 gia-c9i-36rour32

Tabla de contenido