Please read completely through the instructions and verify that all listed parts and hardware
are present before beginning assembly.
A- Top Panel with Metal Frame
(Qty. 1)
D- Spine Assembly (Qty. 1)
G- Middle Glass Shelf (1)
JR
J- Monitor Bracket (Qty. 2)
(1) 1/2" Bolt
(Qty. 4+1 extra)
(5) 2-1/2" Bolt
(Qty. 1+1 extra)
Parts and Hardware List
B- Middle Metal Frame
H- Swiveling Bracket (Qty. 1)
JL
K- Cable Wheel (Qty. 2)
(2) 5/8" Bolt
(Qty. 15+1 extra)
(6) Lock Washer
(Qty. 16+1 extra)
(Qty. 1)
E- Leg (Qty. 2)
(3) 1" Bolt
(Qty. 6+1 extra)
(7) Flat Washer
(Qty.16+1 extra)
3
C- Bottom Panel with Metal Frame
(Qty. 1)
F- Top Frame Support (Qty. 1)
I- Mounting Frame (Qty. 1)
L- Stop Rail (Qty. 1)
(4) 1-5/8" Bolt
(Qty. 10+1 extra)
(8) Flange Nut
(Qty. 1+1 extra)