PineBluff ssembly Instructions
Fig. 7
Swing Beam Drill Locations
1. Step 1: Tap T-nut into 3/8'' hole as shown in (Fig. 7).
2. Step 2: Place a bottom beam clamp over the swing hanger as shown in (Fig. 7).
3. Step 3: Insert the swing hanger into the beam and thread it into the T-nut until it is flush or near flush with the
top of the T-nut. A screwdriver may be used to twist the hanger (Fig. 7). Orient swing hanger as shown
in (Fig 7).
4. Step 4: Use (4) 1-1/4'' screws to secure beam clamp.
5. Check hanger to ensure it does not spin.
6. Repeat for all four hangers.
T-nut
t-nut
Bottom Beam Clamp
(4) 1-1/4'' screws
Hammer
3/8'' hole
Use Screwdriver to aid in tightening
Swing Hanger
14
1-1/4'' Screw