Descargar Imprimir esta página

Inspection And Maintenance Intervals - BOERPLAY Castle Drachenfels Instrucciones De Instalación

Publicidad

Inspection and maintenance intervals

Nr. Inspection
Verify equipment's stability, junctions and
1
missing parts. Inspect bolts, screws and nuts for
absence, jams, corrosion and wear.
2
Check suspension for wear.
Inspect rotating parts such as hinges, rolling-
3
element bearings, etc. for wear and acceptability.
Check wood for splinters, unacceptable damage
4
and signs of rot, especially at ground level.
Inspect foundation for stability, tearing and
5
coverage.
Examine rubber and synthetic parts for wear,
6
damage and breakage.
Examine fibre reinforced plastic parts, especially
7
slides, for wear.
Inspect metal for corrosion and damage in the
8
coating.
Check ropes, cables, chains and nets for wear
9
and damage. Steel cables and nets which are
tensioned must be checked for tension.
Inspect equipment for unsafe changes and
10
additions.
11
Inspect safety surfaces.
Remarks
1. If used intensively, all points require extra attention.
2. Extreme weather conditions and locations may require a higher inspection frequency. Discuss this with the
supplier.
3. Vandalism-sensitive locations require stricter inspections, possibly daily.
4. Re-tighten all connections in Robinia equipment two months after first use.
5. Re-span spatial networks two months after first use.
6. Check the terrain regularly for items that do not belong there, are unsafe or may be used wrongly. Examples
are poisonous plants, glass shards, etc. Frequency depends on strain.
Maintenance
Add missing parts, secure joints, apply
missing fixing agent and replace
corroded parts.
Replace worn parts and/or remove non-
functioning parts.
Replace worn parts and/or remove non-
functioning parts.
Repair damage. Replace affected wood.
Smoothen splintered wood and sharp
edges.
Restore foundation and covering
material.
Replace for OEM original parts.
Replace for OEM parts if the fibres are
visible.
Restore any damaged coating (after
removing rust and applying primer).
Replace parts where necessary. Steel
cables and nets must be tensioned.
Remove unsafe additions and correct
unsafe changes.
Restore and repair where necessary.
months
between
inspections
1
1
1
1
3
3
6
6
3
1
1

Publicidad

loading

Este manual también es adecuado para:

Bbie301.cbr