Installing The Valve - Orbit 57860 Manual De Instrucciones

Ocultar thumbs Ver también para 57860:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

INSTaLLING THE VaLVE

Installing the Valve
After flushing line, install the valve using
appropriate fittings (not included) for
your system (see figure below). DO NOT
OVERTIGHTEN. Do not use pipe joining
compound. Use thread seal tape only. Note
arrow on valve for water flow direction.
1"
1"
8
Valves have tapered fittings and therefore
require seven to eight turns of thread
seal tape to prevent leaking and to guard
against the connections bottoming out. To
prevent possible leaking, make sure that
the valve, fittings and pipe are properly
aligned.
Hose
Poly
PVC
Test the System
After all pipe and fittings have been
installed, turn the water supply on and
check for leaks with the valve closed.
The system is now ready to be controlled
electrically from the timer or manually by
opening the manual lever/screw.
Draining
In freezing areas, the valves and lines
will need to be drained. Refer to the
Orbit
®
Layout Guide or local dealer to
recommend proper drain points. To insure
the electric valve is completely drained in
the fall, turn off the main sprinkler shut-
off valve and electrically run each valve dry
for a few minutes. Turn timer to the Off
position.
INSTaLLING THE VaLVE
Cautions
• Check local codes for valve types and
permit information.
• If static water pressure exceeds 80 psi, a
pressure regulator should be used.
• For outdoor use with cold water only. Not
for indoor use. Place valves so they drain
away from the house.
Notes
• Where possible, always protect valves
with an Orbit
Valve Box and place gravel
®
in the bottom.
• Test all lines and fittings before burying
the system.
• Use a filter if you will not be using
culinary water in your system.
9

Publicidad

Tabla de contenido
loading

Tabla de contenido