Through-The-Wall Installations - Friedrich SS Serie Instrucciones Para La Instalación

Ocultar thumbs Ver también para SS Serie:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

The following instructions apply to installations in wood, masonry, brick, concrete or
STEP 1
Follow steps 1, 2, 3 and 4 of the "STANDARD SASH WINDOW INSTALLATION" instructions.
CABINET PREPARATION: Remove the sill plate from the cabinet by removing the four nuts and screw re tain ing the sill
STEP 2
plate. Note that the chassis retainer is secured by a right side nut and screw (See Detail 1, Figure A.) Bend the tabs of the sill
plate down into its channel at both ends of the plate or cut them off (See Detail 2, Figure A.) Turn the sill plate end to end,
180° and reinstall. Reverse the ori en ta tion of nuts and screws so that the head of screw is on bottom of cabinet facing up and
nut is on top facing down (See Detail 3, Figure A.) Insure that the chassis retainer is reinstalled as shown in the detail.
FIGURE A
BEFORE
CABINET
SILL
PLATE
TURN SILL PLATE
END TO END
10
920-036-05 (10-04)

THROUGH-THE-WALL INSTALLATIONS

cinder block con struc tion
SCREW
(2 REQUIRED)
RETAINER, CHASSIS
THIS SIDE ONLY
DETAIL 2
BEND TABS DOWN
NOTE:
HOLES
MOVED TO
BACK SIDE
NUT (2 REQUIRED)
DETAIL 1
AFTER
SCREW AND NUT
ORIENTATION NOW
REVERSED
DETAIL 3
NUT
(2 REQUIRED)
SCREW
(2 REQUIRED)

Publicidad

Tabla de contenido
loading

Tabla de contenido