Complete The Finished Wall And Basin - Kohler K-498 Guia De Instalacion

Torre de ducha de montaje a la pared
Ocultar thumbs Ver también para K-498:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

5. Complete the Finished Wall and Basin

Cover the stud framing with water-resistant wall material.
Tape and mud the water-resistant wall material.
Install the finished wall and basin materials.
Apply a bead of silicone sealant around the water supply lines to seal any gaps between the
supplies and the finished wall material.
Kohler Co.
Apply silicone
sealant.
Finished
Wall
Basin Material
7
1010418-2-D

Publicidad

Tabla de contenido
loading

Tabla de contenido