Descargar Imprimir esta página

Publicidad

Fig. 6
Swing Beam Drill Locations
118''
1. Use a 3/8'' drill bit to drill a 3/8'' hole through
the beam at each location shown in (Fig. 6)
2. Install Swing Hangers onto swing beam at
locations shown.
Note: Swing Hangers must be installed on the same
99''
87''
81-1/2''
67-1/4''
48-1/4''
34-1/4''
15-1/4''
Drill 3/8''
3-1/2''
15
PB 9210 ssembly Instructions
side dimensions were originally measured
and marked.

TOP VIEW

Hole

Publicidad

loading