ASSEMBLY INSTRUCTIONS
FIGURE 1
14
SAVE THIS PIECE OF LUMBER
GUARDE ESTE PEDAZO DE MADERA
CONSERVER CETTE PIÈCE DE BOIS
PINNACLE PREPARATION
NOTE: Before beginning construction of
the Turbo Tower, several boards and rails
and rails must be cut or removed from
the Pinnacle.
1. Remove the top 2" x 4" board from the
front of the unit as indicated by removing
the screws at each joint.
2. Cut the 2" x 4" rail flush to the existing
upright as indicated. Remove the cut
board from the front of the unit as
indicated by removing the screws.
3. Remove the entire rail section of deck two
by removing the screws at the rail/post
joints.
4. Cut the 2" x 6" bottom support flush with
the existing 4" x 4" post as indicated.
Remove the carriage bolts and screws
from both pieces. NOTE: The section of
the bottom rail which is not shaded will be
re-used. Do not discard this section of
lumber.
5. Remove the carriage bolts and screws at
each end of the bottom 2" x 6" s as
indicated and remove.
6. Collect all lumber and hardware removed
and safely discard.