Swing-N-Slide Timber-Bilt Turbo Tube Slide Instrucciones De Ensamble página 22

Para adherir este equipo al pinnacle
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

ASSEMBLY INSTRUCTIONS
22
FIGURE 6
4" x 4" x 36"
2" x 4" x 45-1/2"
4" x 4" x 36"
2" x 4" x 45-1/2"
FIGURE 7
5/4" x 6" x 36"
5/4" x 6" x 36"
2" x 6" x 37-1/4"
2" x 4" x 37-1/4"
TOP RAIL INSTALLATION
1. Drill a 3/8" hole through the 4" x 4" x
36" boards (2 are required)
approximately 8" from the top and
bottom of each board. Counterbore
each hole 1/2" deep.
2. Position each 4" x 4" flush with the top
of the deck and existing posts as
indicated in Fig. 6. Mark the hole
locations on the posts and drill 3/8"
holes through the 4" x 4" posts at the
marked locations.
3. Align the holes of the 4" x 4" x 36"
boards and the posts and secure
using two 7" carriage bolts, wood loc
washers, washers and loc nuts per
board.
4. Attach a 2" x 4" x 45-1/2" bottom rail
support to each side of the deck using
four 3" screws per joint. The rail
supports should rest on existing deck
boards.
5. Evenly space five 5/4" x 6" x 36" rail
uprights in each opening as shown in
Fig. 7. Attach the uprights to the
supports using two 2" screws at the
top and bottom of each board.
6. Attach a 2" x 6" x 37-1/4" board to the
front of the tower using four 3" screws
per joint. NOTE: The top of the 2" x 6"
x 37-1/4" should be flush with the top
of the deck.
7. Attach a 2" x 4" x 37-1/4" directly
below the previously attached board
using four 3" screws per joint.

Publicidad

Tabla de contenido
loading

Tabla de contenido