Installing The Switch In An Equipment Rack - Nortel 5600 Serie Manual Del Usuario

Tabla de contenido

Publicidad

Set the switch on a table or shelf.

Installing the switch in an equipment rack

Required tool: Phillips screwdriver for attaching brackets to the switch.
Rack requirements:
Nortel Ethernet Routing Switch 5600 Series Regulatory Information
Copyright © 2007, Nortel Networks
.
Note: Allow at least 2 inches (5.1 cm) on each side for proper ventilation
and at least 5 inches (12.7 cm) at the back for power cord clearance.
A space of 2.8 inches (71.1 centimeters) for each switch in an EIA or
IEC standard 19 inch (48.2 centimeter) equipment rack and TIA 23 inch
(58.5 centimeter) equipment rack.
Appropriate space to accommodate unit height:
ERS 5650 models require one rack unit (1.75 inches, 44.45 millimeters)
ERS 5632 models require 1.5 rack units (2.625 inches, 66.68 millimeters)
ERS 5698 models require 2 rack units (3.5 inches, 88.90 millimeters)
The rack must be bolted to the floor, and braced if necessary.
Nortel Ethernet Routing Switch 5600 Series
NN47201-101 01.02 Preliminary
6.0 16 January 2008
Before you begin 15

Publicidad

Tabla de contenido
loading

Tabla de contenido