Descargar Imprimir esta página

Swing-N-Slide PIONEER Instrucciones Para Armar página 22

Ocultar thumbs Ver también para PIONEER:

Publicidad

Idiomas disponibles

Idiomas disponibles

x2 Per Swing
58" Coated Chain
x2 Per Swing
Sling Swing Seat
BOTTOM OF
SEAT
x2 Per Swing
BOTTOM OF
SEAT
Nylon Bushing
Swing Hanger
NEVER
hang a swing seat by a partial link
of chain! Remove and discard partial links.
Swing Seat Assembly.
Fig. 15
1. Take one length of chain and place the last link of chain through the Quick Link as
shown. (Fig. 15).
Quick Link
Fig. 16
2. Place the Quick Link through the Grommet of the swing seat as shown
Fig. 17
3. Tighten the threaded sleeve of the Quick Link with a suitably sized wrench so that the
seat is securely attached and the Quick Link cannot be easily loosened. Repeat for
second chain, Quick Link and
Swing Seat Grommet. (Fig. 17).
Fig. 18
4. Hang the chains from the nylon bushing swing hangers. Crimp the hook opening
closed with pliers to secure the chains to the swing hangers. (Fig. 18). Make sure all
connections are tightly crimped and secure before using swing seat.
INSTRUCCIONES PARA ARMAR
DIRECTIVES D'ASSEMBLAGE
Quick Link
"Open"
Note:
For correct installation, the thread must be at
the bottom
22
ASSEMBLY INSTRUCTIONS
.
(Fig. 16).
Quick Link
"Closed"

Publicidad

loading