[Fig. 4.2.1]
A
B
[Fig. 4.4.1]
A
B
A
1
B
A:
25 cm
A Downward pitch of more than 1/100
B Insulating material
D Drain discharge port
F Tie band (accessory)
5
[Fig. 5.0.1]
4
4.2
A Cut here
B Remove brazed cap
C
D
E
G
2
B:
1.5 – 2 m
C Supporting bracket
E Drain hose (200 mm long, accessory)
G Hose band (accessory)
B
D
[Fig. 4.3.1]
B
C
A
D
E
F
4.4
[Fig. 4.4.2]
F
A
VP-25
A BC controller
C Collecting pipe
A
A Control box
C
B Power source wiring
C ø21 hole (closed rubber bushing)
D Transmission wiring
4.3
A Locally procured insulating material
for pipes
B Bind here using band or tape.
C Do not leave any opening.
D Lap margin: more than 40
E Insulating material (field supply)
F Unit side insulating material
D
VP-30
B
B
C
3
B Indoor unit
D Please ensure this length is at least 10 cm.