General Instructions - T&S B-0507 Instalación Y Las Instrucciones De Mantenimiento

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

General Instructions

Installation:
1. Shut off water supply and drain lines.
2. Drill (two) holes for ½" NPT (National Pipe Threads) inlets and (one) ½"
NPT outlets for connections coming from wall. (See drilling dimensions for
hole.)
1-15/16
fl oor
3. Mount assembly to fl oor with two no.3's, allowing 4" [10 cm] or more
from back of unit to wall. Install two (2) inlets (hot and cold sides) and one
(1) outlet.
4. Apply tefl on tape or pipe joint compound to threads of supply lines. Con-
nect supply lines with ½" NPT piping.
5. Turn on water and check for leaks.
Note: It is strongly recommended that each supply line be equipped with a
hammer arrester installed per manufacturer's instructions. A typical installa-
tion is shown:
insert
no.3
fl oor
Note: To order replacement parts, order the B-50-P parts
kit. (For repair of no.7)
1"
wall
4"
[10 cm]
4
1/2" NPT Outlet
1/2" NPT Inlet
3/4"
C/C
Note: Piping and
hammer arrester sup-
plied by others.
out
in
hammer arrester

Publicidad

Tabla de contenido
loading

Tabla de contenido