SCOPE OF DELIVERY
The following fixing material is included in the scope of delivery:
•
Brackets (2 pcs.)
•
Metal rods (2 pcs.)
•
Plastic bushings (2 pcs.)
•
End caps (2 pcs.)
•
L-bolts (2 pcs.)
•
Hardware (lag screws, dowels, washers)
INSTALLATION
Slide the plastic bushings into the left and right bracket.
1
EN
11