Install The Upper Handle - GreenWorks Commercial 82SN22 Manual Del Operador

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

EN
7.2
CAM LOCK ASSEMBLY
Do not tighten the knob until the cam lock is in place.
13
1. Remove the knob (16) and spacer (31) from the cam lock
(32).
2. Insert the bolt (17) through the lower handle housing.
3. Slide the spacer (31) over the bolt (17).
4. Screw on the knob (16).
5. Fold the cam lock (32) to lock the handle into place.
7.3
UNFOLD THE MIDDLE HANDLE
15
1. Open the quick-release levers (12) on the two sides of the
middle handle (15).
2. Unfold the middle handle (15) until they come to a stop.
3. Close the quick-release levers (12).
4. Tighten the knobs (16) to hold the middle handle (15) in
position.
NOTE
16
31
17
15
32
12
English
7.4

INSTALL THE UPPER HANDLE

17
1. Align the holes in the middle handle (15) and the upper
handle (14).
2. Put the bolts (17) through the holes.
3. Tighten the handle knobs (16) onto the bolts (17).
4. Do the same operation on the other side.
7.5
INSTALL THE CHUTE-ROTATION
BOX
23 24
19
1. Align the holes in the panel of the chute-rotation box (23)
and the switch box (24).
2. Put the chute-rotation box screws (18) through the holes.
3. Tighten the chute-rotation box screw nuts (19) with a
wrench (not included).
8
14
16
15
18

Publicidad

Tabla de contenido

Solución de problemas

loading

Productos relacionados para GreenWorks Commercial 82SN22

Tabla de contenido