The manufacturer declares that the appliances are compliant with the prescriptions of the EEC norm 90/396. The
installation must be done observing the norms in force particularly concerning room ventilation and discharging gas
emissions.
N.B.: The manufacturer declines any responsibility for direct or indirect damage caused by improper or incorrect
installation, maintenance or use of the appliance or alterations as in all the other cases considered in the items of our
sales conditions.
DIMENSIONS
NOMINAL HEAT OUTPUT
GAS CONNECTION ISO R7
•
The operations for installing, conversions for use with other types of gas and starting up must be done only by
qualified personnel whose qualifications comply with the norms in force.
•
The gas installation, the electrical connections and the rooms in which the appliances are installed must comply
with the norms in force in the Country in which the installation is carried out; above all, the appliance must be
installed in a well ventilated room, preferably under an extractor hood, so as to ensure the complete extraction of
gas emissions which are formed during combustion. The air necessary for combustion is 2m3 /h per kW of power
installed.
During installation it is necessary to observe a maximum distance between the front edge of the supporting cabinet and
the appliance. (See drawing at item "emptying the water container")
Ensure that the air outlets in the place of work are sufficient to guarantee the necessary air exchange, as stated in
paragraph 4.3 of the UNI-CIG. norm 8723.
We remind you that appliances installed in buildings for public use must meet the following requirements:
In Italy:
1) Installation regulations
Installation and maintenance of the appliance must be carried out following the correct procedures and written
regulations in use, in particular:
•
safety norms against fire and panic in public buildings
a)
general instructions
-
For all appliances:
the connection, installing the system and appliances, ventilation and discharging fumes must be carried out in
accordance with the manufacturer's instructions by professionally specialized personnel in compliance with the
UNI-CIG norm 8723. The electrical part must comply with the E.I.C. norms in force; furthermore, the current rules
laid down by the Fire Brigade must be observed.
GB
DECLARATION OF COMPLIANCE
GAS TECHNICAL DATA TABLE
MODEL
INSTALLING THE APPLIANCE
CHECKING CORRECT VENTILATION
IE
IT
CH
BM-74G
BMT-74G
40x70x90
40x70x90
3,5
3,5
R 1/2GM
R 1/2GM
27
BM-78G
BMT-78G
80x70x90
80x70x90
6,5
6,5
R 1/2GM
R 1/2GM