Installation
NOTICE: Be sure elbow lines up with hole in base.
12. NOTICE: Tighten nuts as follows:
A. Hand tighten all nuts.
B. Tighten one nut snug.
C. Tighten opposite nut snug.
D. Proceed, tightening opposite pairs of nuts to a
snug fit.
E. Recheck all nuts, using same pattern. Be sure all
nuts are tight and that you have a good seal.
NOTICE: Do not overtighten; you may twist studs
off of tank. If you have a torque wrench, tighten to
85 inch-pounds torque.
13. Stand tank on feet and reconnect piping.
14. Recharge tank to proper air pressure (see Page 4).
15. Prime pump (see pump owner's manual).
AIR VALVE REPLACEmENT
Hazardous Pressure. To be sure air valve
and core cannot blow out of tank, release all air pres-
sure from tank before removing valve core or valve.
1. Disconnect power to pump.
2. Drain ALL water in system by opening faucet closest
to tank.
3. Depress valve core to release ALL air pressure in tank.
When air stops coming out of valve, remove core from
inside of valve to release remaining pressure.
4. Push air valve back into tank. Be sure to remove it
before reassembling tank.
5. Disconnect piping from tank and turn it on its side.
6. Remove flange from tank.
SUBmERSIBLE AND mULTI-STAGE INSTALLATIONS
NOTE: When using metal pipe with plastic fittings use only PTFE pipe thread sealant tape on male threads.
Tank with Submersible Pump
Pressure
Pressure
Gauge
Switch
From Well
PIPING CONNECTIONS
To service
Pressure
Relief Valve
7. Push bladder into tank far enough so that you can get
into tank with a dowel rod.
8. Soap the outside of the new valve and mount it on
the end of a piece of 1/4" or 5/16" dowel rod. Push
the valve up past the bladder into its mounting hole
in the top of the tank. Push it through as far as it will
conveniently go; leave the valve cap on to protect
the threads on the valve.
9. Rap the end of the dowel sharply with a hammer to
drive the valve into position. Be sure the shoulder
on the valve seats against the tank head (the ridge
around the valve body should be all the way through
the hole in the tank head – see Figure 6).
Figure 6 – Tap valve into place
10. Remove the dowel. Make sure the old valve has been
removed from the tank, pull bladder back over rim of
hole in lower tank head, reinstall flange, stand tank
upright and reconnect piping.
11. Recharge tank (see Page 4), turn on power, fill system
(Page 4), and tank is ready for service.
Tank with multi-Stage Pump
Pressure
Relief Valve
160 0893
2869 0697
To Service
6