Running The Generator - Wacker G50 Manual De Operación

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

G50/G70/G85
c
On/I
Off/0
L1 L2 L3
7. After engine starts, allow it to warm up for a few
minutes and check readouts on LCD panel. The
"TIME TO SERVICE" interval will be displayed.
Make sure battery charging system, oil pressure and
engine temperature readings are within normal
ranges.
8. Check that AC voltage is correct. Voltage can be
fine-adjusted by turning the voltage adjustment rheo-
(f)
stat
on the metering panel.
9. Check frequency. Under no-load conditions, fre-
quency should read around 61.5 Hz, dropping to
near 60 Hz as the generator load is switched on.
All manuals and user guides at all-guides.com
20
15
12
8
INCHES
EMERGENCY STOP SWITCH
NOTAUSSCHALTER
INTERRUPTOR DE URGENCIA
INTERRUPTEUR D'URGENCE
TERMINAL DOOR OPEN
KLEMMENABDECKUNG OFFEN
PUERTA DE BORNES ABIERTA
CACHE-BORNES OUVERT
Ø
A
Hz
V
STOP
g

1.28 Running the Generator

Leave the Engine Start Switch
position while the generator is operating. If the generator
was started using a remote switch, leave Engine Start
Switch in the "REMOTE START" position. Let the gen-
erator run for a few minutes to warm engine before
closing main circuit breaker.
WARNING
Before closing breakers, make sure that any electri-
cal devices attached downstream from the genera-
tor will not start up unexpectedly.
While the generator is running, check for excessive
vibration, oil leaks, or coolant leaks.
OPERATION
1A
d
e
REMOTE START
FERNSTART
ARRANQUE REMOTO
DEMARRAGE A
DISTANCE
START/RUN
START/LAUF
ARRANQUE/MARCHA
DEMARRAGE/MARCHE
1026SD72
f
(e)
in the "RUN/START"
1A-25

Publicidad

Capítulos

Tabla de contenido
loading

Tabla de contenido