Operational Safety - MetalTech BuildMan I-BM6GR Directivas De Seguridad E Instrucciones De Montaje

Sistema de barandilla de seguridad
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

2

OPERATIONAL SAFETY

READ BEFORE BEGINNING ASSEMBLY.
FAILURE TO UNDERSTAND AND FOLLOW ALL SAFETY RULES AND ASSEMBLY INSTRUCTIONS
COULD RESULT IN SERIOUS INJURY OR DEATH.
METAL CONDUCTS ELECTRICITY:
Do not use this equipment where contact may be made with power lines or other live electrical circuits.
DO NOT OVERLOAD:
This scaffolding is designed to support a maximum load of 1,000 lb (454 kg). The maximum load capacity decreases
when stacking units: one unit high = 1,000 lb (454 kg) / two units high = 878 lb (398 kg) / two units high with
guardrails = 835 lb (379 kg).
OPERATION AND SAFETY
Do not use this equipment if you are in poor health, taking medications,
drugs, or have been consuming alcohol, all of which may impair your
ability to work safely on this product.
Always use a scaffold in conformity with local or national legislation
which applies.
Never stack more than two units.
Always lock coupling pins to stacked units.
Always use outriggers, coupling pins and guardrails when stacking units.
Inspect before use. Do not use scaffold if damaged or parts are missing.
Examine thoroughly to make sure unit is properly set up.
Before scaffold units are to be stacked, a set of (4) Outriggers with
casters shall be installed on the base section of scaffolding. The casters
must be the same size as the casters in the base scaffold.
Outrigger must be flush against scaffold leg and caster must be in
contact with the surface.
Guardrails must be installed on all open sides of a work platform where
a person could fall from a height of 6 ft (1.8 m) or more.
Always fasten the guardrails system to the structure using pigtails.
Guardrails must be installed so that access door swings inward
over platform.
Always lock all access doors using door latches, even if the scaffold
is in use or not.
Always use outriggers secured to the structure with the locking pins.
Always use casters locked to the structure with the locking pins.
Do not climb unless all casters are in locked position.
ALWAYS INSPECT
BEFORE USE
ALWAYS LOCK
COUPLING PINS TO
STACKED UNITS.
ALWAYS KEEP
BODY CENTERED
INSIDE STRUCTURE
OF UNIT
All photos and drawings in this booklet are for reference purposes only. Refer to applicable OSHA, ANSI or CSA codes and regulations for the proper use of this equipment.
Lock the casters on the outriggers each time you lock the casters on
the base scaffold. This is to be done prior to climbing the scaffolding.
Erect to be plumb on firm and level surface.
Must be used on a firm surface that is free of pits, debris,
holes or obstructions.
Never place anything under or attach anything to a scaffold to increase
height or to adjust to uneven surfaces.
Acids are corrosive and can seriously affect strength. Do not expose
to corrosive substances.
Keep scaffold free of debris and unnecessary equipment.
Always keep body centered inside structure of scaffold.
Remove or fasten all tools, material or equipment before moving.
Use extra caution when moving to avoid tipping.
Never try moving this scaffold while standing on it.
Never move a scaffold with a worker within.
Do not use powered devices to propel this scaffold. Use extra caution
near operating machinery.
Do not use if the surface is not firm and level.
Do not use in inclement weather or high winds.
Maintain a firm grip while climbing.
Do not modify the scaffold or any of its components.
Do not use the scaffold as a footbridge.
ALWAYS LOCK
ALL CASTERS
BEFORE CLIMBING
2
NEVER STACK
MORE THAN
TWO UNITS.
MAX.
ERECT ON FIRM
AND LEVEL GROUND
SAFETY RAILS MUST BE
INSTALLED ON ALL OPEN
SIDES OF A WORK PLATFORM
WHERE A PERSON COULD
6'
FALL FROM A HEIGHT
(1.8 M)
OF 6 FT (1.8 M) OR MORE
METAL CONDUCTS
ELECTRICTY
DO NOT USE IN
INCLEMENT WEATHER
OR HIGH WINDS

Publicidad

Tabla de contenido
loading

Tabla de contenido