Figure 7
Figure 8A
8B
Step 4: Pos on the template ve
mark the screw holes. Mount the wall
onto the wall with screws included.
Figure 9A
Step 6: Place panels on the mounted wall
ngs, as shown in Figure 12A and 12B.
Step 3: On the end panels, remove the ve
bars.
Turn clockwise to loosen the ve
pull down to remove.
Note: To repos on the panel with the door,
simply follow the dire ons to set up the
Superyard as an enclosure. Select and
disconnect the two panels you desire to mount
to the wall or surface.
8D
8C
al to the floor and
ngs A, B, C
9B
al bar, then
Step 5: A ach floor spacer-D to lower
hinge housing.
9C
Step 7: Insert removable bars through wall
ng-C on both sides of gate, pos oning the
bars in lower hinge housing.
Page 5
al
8E
9A