Descargar Imprimir esta página

Swing-N-Slide Tunnel Twister Slide Instrucciones De Ensamblaje página 8

Publicidad

Fig. 5
E. Second Elbow and Slide Exit
1. Align the seams of the second Elbow Section to
the First Elbow Section as shown in (Fig. 5).
2. Secure in place as shown in (Fig. 5).
3. Attach exit section so that the Slide Base is level
on the ground, as shown in (Fig. 5a).
4. Use the Slide Bracket to determine an appropriate
location for the 4'' x 4'' x 66'' Slide Support.
5. Dig a hole 18'' deep aligned with the previously
determined location as well as located near the
first bend of the slide as shown in (Fig. 5b).
Place the 4'' x 4'' x 66'' Slide Support in this hole
as shown and set in place.
6. Tighten all slide bolts securely.
Tunnel Twister ssembly Instructions
(1) 3/4'' Bolt
(2) Flat Washer
(1) LocNut
Per Hole
Fig. 5b
8
Fig. 5a
18''
(1) 3/4'' Bolt
(2) Flat Washer
(1) LocNut
Per Hole
Ground Level

Publicidad

loading

Este manual también es adecuado para:

Tb 1408