Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Installation Steps
Position the driver's side running board onto bracket and center on vehicle. Adjust Running Board to be parallel with
Tighten all bracket hardware, position the board accordingly, and then tighten Running Board to brackets.
5
Inspection After Installation
• Inspect all bolts and nuts for proper tightness.

Care and Cleaning

• Wash only with mild soap & dry with a clean cloth.
• Do not use cleaning solvents of any kind.
Congratulations!
You have purchased one of the many quality Lund
our products and want you to enjoy years of satisfaction from your investment. We have made every effort to ensure that your product
is top quality in terms of fit, durability, finish and ease of installation.
NOTE: Actual application may vary slightly from illustrations.
/ El uso real puede variar respecto a las ilustraciones. / L'application réelle peut varier légèrement des illustrations.
side of vehicle. Install (4) 5/16" flange nuts (bolts are already installed on board).
Repeat Steps 1 thru 8 for opposite side of vehicle. (Fig. 9)
®
branded products offered by Lund International, Inc. We take the utmost pride in
Lund International
800-241-7219 • Visit us at lundinternational.com
© 2013 Lund International, Inc. All rights reserved.
Lund
and the Lund
logo are trademarks of Lund International, Inc.
®
®
Fig. 9
Page 4 of 4

Publicidad

Tabla de contenido
loading

Tabla de contenido