Technical Specifications - Urrea 2493 Manual De Usuario

Pluma hidráulica plegable
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

TECHNICAL SPECIFICATIONS

Capacity
A
B
C
D
E
F
G
R min
R max
1
Extensible arm
2
capacity according
3
to its position
4
1000kg
137 cm
170 / 177 / 183 / 191 cm
125 cm
98 cm
175 cm
34 cm
68 cm
87 cm
11,4 cm
250 kg
500 kg
750 kg
1000 kg
ASSEMBLY INSTRUCTIONS
During the assembly procedure, nuts
and bolts should be hand-tightened
only. Once assembly is complete, nuts
and bolts must be fully tightened.
1. Attach two 3½" swivel caster (24) to
base assembly (28) using hex bolts
M8x20 (16), lock washers Ø8 (17)
and hex nut M8 (23).
2. Referring
to
drawing, insert right leg assembly
(32) into the base assembly (28) and
lock the leg in place using two lock
pins (26) and secure these in place
using two R pins Ø2 (27). Repeat this
procedure for the left leg.
3. Attach the support post (20) to
base assembly (28) using hex bolts
M14x100 (8), flat washers (9) and
hex nuts M14 (10).
4. Attach the ram unit (21) to the
support post (20) using hex bolt
M16x90 (22), flat washer Ø16 (12)
and hex nut M16 (13).
5. Now secure the boom (7) to the
support post (20) using hex bolt
M16x110 (15), flat washer Ø16 (12)
and hex nut M16 (13).
6. Connect the ram unit (21) with
boom (7) using hex bolt M16x70
(11), flat washer Ø16 (12) and hex
nut M16 (13).
7. Insert boom extension (6) into the
boom (7), secure in one of the four
positions using hex bolt M14x100
(8), flat washer Ø14 (9) and hex nut
M14 (10).
8. Secure the handle (18) to the support
post (20) using four hex bolts M8x20
(16) and lock washers Ø8 (17).
9. Turn up the support leg on the base,
using the hex bolt M6x30 (29) & hex
nut M6 (30) to lock it.
10. Now tighten all nuts and bolts.
E N G L I S H
the
spare
parts
9

Publicidad

Tabla de contenido
loading

Tabla de contenido