7. Lifting under load
a. Lift a load to appr. 500 mm height
b. Check that all the mounting points are in contact with the vehicle. If all points are in contact
with the car, the stage is straight.
8. Fill in after installing the enclosed checking book.
This information will be required in case of a possible claim.
2.10 Completion of Work
Before commissioning, check all fastening screws, electrical, pneumatic and hydraulic
lines and, if necessary, tighten these. Warning: in some cases, this must be checked at
regular intervals and tightened if necessary (note in the instructions).
® Copyright ATH-Heinl GmbH & Co. KG, All rights reserved / Misprints and technical changes reserved / As of: 2020-03
Manufacturer ATH-Heinl GmbH & CO.KG
- 15 -