Tail And Nose Assembly - Rutland 914i Manual De Instrucciones

Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

Rutland 914i Windcharger
Fitting The Tail and Nose Assembly (Fig.4)
1. Slide the tail fin between the two tail brackets lining up all drilled holes.
2. Locate the two screws provided through the appropriate holes and secure
with nuts.
3. Locate the tail bracket covers into the nacelle grommet whilst positioning the
processes for the fixing screw into the appropriate drilled hole in the tail.
4. Secure with the self tapping screw provided.
Tail Brackets
4. Fit the plastic nose dome in position on the front of the generator hub and
secure in place with the three nylon screws provided.
5. You may now mount the Rutland 914i to the tower if you have not already done
so.
Doc No:SM-137 Iss. E 11.03.19
Tail Bracket Covers
Nacelle
10
Installation & Operation
Tail Fin
Fig.4
Marlec Eng Co Ltd

Publicidad

Tabla de contenido
loading

Productos relacionados para Rutland 914i

Tabla de contenido